DEMOLITION & REINSTATEMENT
Demolition & Reinstatement
in Singapore.
Strip-out, dismantling, hacking, removal, making-good and reinstatement works for commercial, residential and project handback requirements.
TYPICAL SCOPE
What may be included
- Internal strip-out and dismantling
- Hacking and removal works
- Ceiling, partition and finishes removal
- M&E disconnection coordination
- Debris clearance and disposal
- Making-good and reinstatement
- Landlord / tenancy handback requirements
- Site-specific demolition scope review
HOW WE APPROACH IT
Scope before execution.
Review
Drawings, demolition plans, BQ/SOR and scope documents are reviewed.
Verify
Site access, hidden conditions and interface risks are checked where necessary.
Execute
Works are sequenced with safety, removal logistics and making-good requirements in mind.
PRICING & SITE CONDITIONS
Quote based on the information available.
Pricing is based on the drawings, documents and site information provided. Concealed, unforeseen or differing actual conditions may require variation to scope, cost or programme after verification.